Sendai celebrates SkyTrain technology with opening of new Tozai Line

sendai-map

Sendai Subway map showing the new Tozai Line (east-west line in blue)

The sun is rising over a quiet city, where the lights inside 13 new rapid transit stations turn on and the first station staff make their way down the relatively unused escalators to prepare to open the platforms for the first wave of customers.

The familiar hum of a linear induction motor system populates the station as the first of 15 four-car trains rolls in from the maintenance yard, ready to board passengers for the first service of the day.

If you think I’m describing an event in Vancouver, you would be wrong because I am describing what’s happening right now in a major Japanese city, one that decided to build a brand new rapid transit line with the same SkyTrain technology developed in Canada and pioneered here in Vancouver.

See: New subway line opens in disaster-hit Sendai – The Japan Times

Sendai, Japan is the city that was hit hard during the March 11, 2011 Tohoku earthquake and tsunami. The completion of the new Tozai Line, a 14km rapid transit subway with both underground and elevated stations, has turned the page for the city, marking its vibrance and prosperity as it progresses in its recovery from the devastation of 4 years ago.

I went back to Sendai for a business trip, and it also happened to be the day the Tozai line opened to the public. It was crazy! The city and its people are treating it like a big event!
-Ryukyurhymer from Skyscrapercity (LINK)

This slideshow requires JavaScript.

Videos and photos of the launch celebrations show thousands of people making use of the new system, and celebrations ranging from idol girl groups performing on the station platforms, local sports team mascots out to celebrate, men in samurai outfits, traditional dance performances on board the trains, and picnics at the park beside the train’s visible elevated section. It is a lively hustle and bustle and the mood appears to be as festive as when I visited Sendai just 4 months ago to attend the city’s most famous Tanabata Festival, as part of my 1-year Japan studies journey. It is arguably the biggest occurrence in the city since this August and the biggest revolution for the city since the first steps in recovery were made after 2011.

Pictures from TransLink of mockup Mark III Skytrain vehicle

SkyTrain technology was developed in Canada and pioneered right here in Vancouver.

Since the first km of demonstration track opened in early 1983 here in Vancouver, SkyTrain technology has made its way around the world with just over 20 systems complete or being proposed in 15 cities worldwide. We have reinvested in it and expanded our system several times, yet we’ve been overtaken by a certain Guangzhou, China that has made a monstrous investment in this technology with over 99km of track – reaching 130km by next year.

Sendai’s will to revitalize their city with the help of a technology pioneered here in Vancouver, Canada should be seen as a wonderful treat and a mark of our contributions to this technology’s progress, and a reminder of the big impacts we can make with choices that we would otherwise deem irrelevant. Sendai’s choice of SkyTrain technology will help the city fast-track its ongoing recovery from the events of 4 years ago.

The line will serve 80,000 riders a day next year, with an additional 3% more estimated to come each year and grow the system’s ridership. According to the schedule on the city’s website, trains will run every 3-4 minutes during peak hours and no less frequently than every 7.5 minutes at off-peak times and weekends – an excellent service standard for a medium-sized city of 1 million people.

This slideshow requires JavaScript.

The new line is already enabling new transit-oriented development nodes in the city, maximizing the line’s potential and giving a nod to the transit-oriented development practices that Greater Vancouver pioneered for every city in North America.

In an area around Arai Station, work to establish a new community of nearly 20,000 people is progressing. Public apartments have been built for those affected by the tsunami, with people moving there from areas closer to the Pacific coast as part of a collective relocation program. (The Japan Times)

We should celebrate a technology that’s made an impact around the world

As a result of the practical research for three years from Fiscal 1985, we confirmed that low-cost subway “Linear Metro” that has been developed as a public transport is suitable for regional hub city as a semi-main metropolitan line or branch line. For this reason, the Japan Subway Association established the “Linear Metro Promotion Headquarters” within the association in October 1988.

ml98pr_fig2

Comparison of conventional subways and linear motor subways. From Osaka Municipal Transportation Bureau’s info page on LIM technology

Japanese researchers started studying linear induction motors (LIMs) as train propulsion in 1985. After Osaka built Japan’s first LIM line (the Nagahori Tsurumi-Ryokuchi line), it was found that the city had saved approximately 20% in construction costs. This is one of the key advantages that come with LIMs – the less-complicated motors enable trains to have lower platform heights, which  means tunnels can be significantly smaller and less costly without impacting the quality of service. There is no doubt that with the majority of Sendai’s new subway line tunneled, millions in cost savings were found with the use of SkyTrain technology.

This same advantage was directly to blame for the use of an existing railway tunnel on our Expo Line SkyTrain downtown, a choice that saved us hundreds of millions of dollars as a traditional light rail system would have required new and larger tunnels to be dug under our downtown core.

“The new line is a symbol of development for the disaster-hit Arai district. I hope the Tozai Line will play a major role in leading the city.”
– Emiko Okuyama, Mayor of Sendai (The Japan Times)

See also: List of Linear induction motor rapid transit systems

Sendai’s system brings the amount of in-service SkyTrain technology systems from 17 to 18. 14 cities/areas are currently using SkyTrain technology, and a 15th (Okinawa Island, also in Japan) has declared its use for a major future transit investment.

I am pleased to hear about and report on this successful launch, and I encourage all of us in Vancouver to cheer this Japanese city and its people in celebrating a brand new era of progress and motion.

Local news report (Japanese)

Watch trains arrive and depart at Sendai Central Station

Advertisements

We can learn from Japan on transit delays/incidents

Video shows that in Japan, even the train evacuations are orderly 【RocketNews24】

As reliable as Japan’s public transportation system is, with so many trains running from morning to night, eventually some sort of problem is going to occur. Passengers heading to work or school in central Kobe had their commute interrupted at approximately 8 a.m. on November 16, when it was discovered that an overhead line had snapped on the Japan Railways (JR) Kobe Line between Kobe and Motomachi Stations.

Seeing that the repairs would take some time to complete, some 5,000 passengers were instructed to leave the carriages, which were stopped in an empty stretch of the tracks, and walk to the nearest station, as directed by JR staff who were on the scene.

Even in Japan, which is known for having one of the world’s supposedly most “punctual” train systems, delays and incidents can occur. Last week in Kobe, this was the scene on the city’s main JR rapid transit line after an incident with an overhead power-line was found, requiring a full shut-down of the system in Kobe and service disruptions throughout the 194km-long intercity rapid transit line.

If this sounds familiar, that’s because it does resemble some of the incidents that have plagued our SkyTrain system here in Metro Vancouver over the past few years.

I’m also sure many of you are aware of what happened to the SkyTrain yesterday (November 24th), when it was shut down in downtown due to a “power failure” incident that turned out to be a ‘one-in-a-million’ misplaced replacement rail part that moved on the tracks and struck/damaged the power shoe of an oncoming train.

Map of JR train lines in the Osaka/Kansai area. The blue line going west-east from Himeji to Maibara through Kobe, Osaka and Kyoto was the line affected.

[OPEN to enlarge] Map of JR train lines in the Osaka/Kansai area. The blue line from Himeji in the west to Maibara in the east was the line affected.

I was in Japan last week and happened to actually experience the Kobe incident in the video at the top of this post, although I wasn’t in Kobe when it occurred. Instead, I felt the ripple effects over 140km away at Maibara Station, on the eastern end of the line, as I transferred from another train from Nagoya intending to ride this particular line en route to Kyoto.

The featured photo at the very top of this post is my own picture of the “trains delayed” notice display I ran into when I arrived at Maibara Station. I could feel my stomach churn even more when I checked the departure time-boards on the station platform itself, which showed that westbound express trains had been completely cancelled.

This left me and perhaps several hundred other passengers waiting on the platform before having to crowd onto a smaller local train, which we would ride until another station down the line (Yasu) where express trains would re-commence. The incident was uncomfortable, cost me nearly 90 minutes in delay and had a major effect on my plans for the day.

This is, incidentally, longer than the approx. 60 minute delay I experienced yesterday when I was caught in yesterday’s SkyTrain delay. I started commuting from Surrey to the Main St. Station area to fulfill an errand, right after delays began at around 2:50PM. I went through stopped trains, crowdedness of the trains and crowded-ness again when I boarded a replacement shuttle bus at Commercial-Broadway Station.

SkyTrain has been through numerous shutdowns in the past year, which many have attributed to be an issue of system reliability. In actuality, many of them the result of the lack of an auto-restart system that was neglected by BC Transit in the 1990s; some of them were genuinely due to human error; and some of them just couldn’t be prevented no matter what anyone did.

Regardless of the cause, we don’t seem to handle these very well. Doors have been broken open, resulting in people walking on the tracks unauthorized and causing further delays as track power needs to be shut down. People tend to respond loudly and angrily on social media, not waiting for the investigation to blame TransLink on whatever happens.

There’s a lot that we can learn from the Japanese when incidents like these happen. In Japan, trains are so critical to the functions of life, responsible for moving millions of people every day in a very dense country. Punctuality is considered very important, and so train operators concentrate on providing the best service possible when everything is working. It’s important to understand that things can sometimes not work – and when that happens, instructions have to be followed and anger has to be calmed. Which is why the train evacuations showcased in the video were so smooth and orderly.

This train line didn't have emergency walkways at door-level like our SkyTrain system - so passengers had to climb down ladders to get onto the track.

This train line didn’t have emergency walkways at door-level like our SkyTrain system – so passengers had to climb down ladders to get onto the track.

The most important thing to remember is that at the end of the day, these incidents don’t actually happen that often – SkyTrain has maintained a statistical reliability that tops transit systems in other cities. I pride myself over having kept myself calm throughout yesterday, and hope that other passengers who were able to do the same do so as well.

See also: Vancouverites are Spoiled with SkyTrain – Vancity Buzz

We can’t let these incidents affect the way we think about transit and play our part in shaping major transit decisions, like the recent NO vote on the regional transit referendum. It’s easy to lose sight of the facts when you’re inconvenienced and made bitter, but at the end of the day, in doing you really aren’t helping anyone.

I’m noticing many commuters on Twitter talking about how reluctant they were to take SkyTrain today. If I had let the incident from last week stop me from using the JR train line again out of fear, I wouldn’t have been able to resume with my plans to visit Himeji Castle and take these gorgeous pictures….

This slideshow requires JavaScript.

Lastly, here’s a bit from the Rocketnews article that perhaps TransLink could take from for next time…

…we think what really sealed the deal is the Japan Railways representative who shows up on the platform at the video’s 0:27 mark, ready to apologize to those who were inconvenienced and hook them up with bottles of tea, which he opens for each person who walks by. Because hey, on the occasions when you can’t be punctual, you may as well be classy.

Man tea 1

Rapid bus, SkyTrain best option for Langley

So I thought I’d put up a newsletter that the Langley Times published today, along with some added sources/notes.

For anyone that’s curious, I intend to be doing some more blogging on the BCER Interurban very shortly.

LETTERS TO THE EDITOR – Langley Times

Rapid bus, SkyTrain connection still Langley’s best option

Editor: Re: LRT announcement ignores less costly interurban option (The Times, Oct. 2)

We should welcome good transit ideas here in Langley, but there’s a reason that TramTrain isn’t one of them.

TramTrain was possible in Karlsruhe because it’s surrounded by numerous electrified regional railways. We don’t actually have that here in Vancouver; and while the BCER Interurban may seem like a tempting choice, it ran three times a day [1] and wasn’t built to service today’s cities [2].

When the province and TransLink conducted the Surrey Rapid Transit Study, the Interurban was denied because it would cost millions to retrofit yet still fall short on providing useful connections and service frequency [3]. In other words, it would be a giant waste of money.

What we do have are numerous fast highways on which we could operate inexpensive rapid buses. One of those, the Trans-Canada, now has the Fraser Valley Express (FVX) service from Carvolth Exchange to Chilliwack. This service is now providing the alternative that valley commuters asked for — but when it came time to consult locals about the FVX, Rail for the Valley did not participate [4].

That’s because Rail for the Valley’s TramTrain and LRT advocacy doesn’t come from a genuine desire to make transit better — but rather an opposition to extending SkyTrain to Langley, even though it will do the most for transit commuters.

Our SkyTrain system boasts a ridership that is higher than any LRT system in Canada and the US. That’s why over 50 cities worldwide have followed our lead by successfully employing ALRT-style driverless metros [5][6].

As an extension of an existing system, SkyTrain would have the lowest addition in annual operating costs [7]. Without transfers, commuters starting at Langley Centre Station could reach Waterfront Station within 60 minutes [8]. That’s the kind of travel time improvement that’ll get people really wanting to use public transit, and generate the fare revenue to recoup costs.

I’m all for good transit ideas; but when it comes to what will objectively serve Surrey and Langley best, rapid buses and SkyTrain are the way to go.

Daryl Dela Cruz,
Campaign manager
skytrainforsurrey.org

Footnotes

  1. BCER article in Canadian Rail No. 534 issued Jan-Feb 2010 with the writer and 4-time BCER book author, Henry Ewert, stating himself that Fraser Valley interurban trains ran 3 times per day (Mirrored on Exporail.org)
  2. An earlier technical assessment found numerous technical/construct-ability issues with interurban rail. Mirrored [HERE]
  3. Surrey Rapid Transit Study: “Compared to other alternatives, lower population and employment densities along much of the corridor and a less direct connection to Surrey City Centre would result in lower transportation benefits.” See last page of Phase II Information Boards
  4. The BC Transit Public Engagement Reports for the Fraser Valley Express, Abbotsford-Mission (CFVT) Transit Future Plan and the Abbotsford-Mission (CFVT) Efficiency Review indicate that there has been no participation by members of Rail for the Valley and other associated initiatives, with no comments on potential Interurban Rail service.
  5. The Automated Metro Observatory regularly reports on the worldwide progress of driverless transit systems. There is an expectation that the amount of fully driver-less metro systems will triple by the year 2025.
  6. In addition, numerous cities worldwide have implemented the same linear induction motor propulsion technology used by SkyTrain. A full list is on this blog: List of Linear Induction Motor rapid transit systems
  7. Funding Still Missing for LRT Operating Costs news release – SkyTrain for Surrey
  8. Based on Surrey Rapid Transit Study travel time estimates.

Yongin Everline Train

‘Everline’ SkyTrain transit system transforms Yongin City, Korea

^ New Yongin Everline promotional video (in Korean)

The 18km “Everline” rapid transit system in Yongin (near Seoul), South Korea, which utilizes the same “SkyTrain technology” trains used here in Vancouver, has celebrated its two year anniversary this past week – and along with that, city residents and officials have also been celebrating its positive effect in transforming the city of Yongin.

A new report published in English by the Korea Herald reports that the Everline is transforming Yongin City – helping to foster business growth and attract high-tech industries, encourage more people to adopt transit-oriented lifestyles and reduce congestion. The Everline is now meeting the ridership projection that was initially made in 2011.

Yongin, once regarded as a commuter town in Gyeonggi Province, is now developing into a business-centered metropolis equipped with a growth engine as it amasses infrastructure befitting a city of more than 1 million residents.

The development has been underway since Mayor Jung Chan-min took office nine months ago. The city is setting up several industrial complex centers including the Yongin Techno Valley currently under construction, and the once-dormant light rail ‘Everline’ is currently used by over 30,000 passengers daily.

[Yongin growing into business-centered city – The Korea Herald]

The Everline story: dismal beginnings

The Everline opened for service in 2013, after being unable to open in 2011 (the line had been fully constructed and in a ready-to-open state since before even then) and again in 2012, due to refusal from the City over issues with both construction and projected ridership (see INTERVIEW with Joongang Daily – Feb 2011). The delay was seen negatively by the Yongin Rapid Transit Company (YRTC), the line’s operator, which was awarded nearly $500 million in damages through the International Court of Arbitration, after suing Yongin City for delaying the opening of the line.

These issues, among others, gave the Everline a very dismal reputation among city residents – and a reportedly low ridership when the line was opened did not make things any better. One group of vocal residents, who were understandably not too happy about the delays and lawsuit, at one point called for the Everline to be dismantled altogether.

Yongin Everline Train

Although the Everline service operates at an exceptional frequency, trains operate with a single car and that has created even more dissatisfaction among critics. Photo from Wikimedia Commons, CC-BY-SA Minseong Kim

But, according to The Korea Herald’s report, it turned out that one of the key problems with the Everline during its initial year of operation was a total lack of fare integration with surrounding transit systems. There was also no direct station-to-station connection or fare integration between the Everline’s terminus station in Giheung, and the nearby Giheung Station of the Bundang Line subway connecting to Seoul City Centre.

Both of these issues were fixed by late September last year, causing ridership levels on the Everline to increase by triple by this April, a period of just over 6 months.

Everline, the major light rail line of Yongin, opened two years ago, but it had been long regarded as a public nuisance with fewer than 10,000 users per day. After implementing the Metropolitan Unity Fare system in September last year, the number of passengers drastically increased. After one month, over 20,000 passengers on average used the light rail daily, and the number reached an average of 30,000 passengers last month.

The ridership is now close to meeting the latest daily ridership forecast of 32000, by the Gyeonggi Research Institute in 2011; and at this rate will surpass it some time this year.

This is very significant for Yongin, because one of the things that pressured the City into refusing to open the line in 2011 was the lack of confidence that it would meet this projection – the city’s internal projections of 10,000 daily riders disagreed with the Gyeonggi Research Institute. The Mayor stated the City did not want to open the line, expressing concern about the increased operating subsidy and a loss of revenue due to lower ridership.

When the line finally opened in 2013, Korean transit blog Kojects noted that the city’s projection had turned out to be true (see No Passengers on Yongin Everline – June 2013) – with the line recording just under 10,000 passengers daily. However, the fare integration with surrounding transit had not yet been implemented, despite its anticipation during previous attempts to open in 2012. Now that it has been implemented, the ridership level is now triple the city’s initial projections and nearly matches the projections set by the Gyeonggi Research Institute; it will handily surpass those projections within this year.

The Everline costs about $26 million to operate yearly, which is a relatively low cost made possible by driver-less train operation. As a result, it is now close to half-way to reaching its total “break-even” point when daily ridership hits 75000 (This is according to a Korean newspaper – [see here]). At 75000, fare revenues will 100% cover all operating costs, completely eliminating the operating expense for city taxpayers.

By comparison, here in Vancouver our SkyTrain lines have hit their break-even points and are covering their operating costs through fare revenue. The newest Canada Line, opened 2009 and using Korean-built trains from Rotem in two-car sets, hit its break-even point of 100,000 daily riders in 2011 (against projections of hitting this in 2013). However, our SkyTrain lines have opened on-time and on-budget. The Canada Line opened several months early, and was bolstered further by the 2010 Winter Olympics in Vancouver.

Everline as an asset to Yongin City

Map of the Yongin Everline

Map of the Yongin Everline

On top of the recent fare integration, new efforts – including the promo video at the top of this post – have been made to promote the viability of the line to residents, many of them still bitter from having to wait years to ride and sitting through the handover of a major chunk of the city treasury.

It’s taken some time, but shuttle buses from the four main universities that are connected by the Everline, which previously were connecting to major transit centres, are now connecting to the Everline (According to previously linked report in Korean – [see link]), helping the universities reduce their transport costs. Activity on the line is increasing and there are now buskers performing at many of the line’s busier stations, fostering a lively urban atmosphere.

New developments on the line aim to take advantage of the Everline’s convenience. One multiple high-rise proposal, at the Everline’s junction with the Bundang Subway Line at Giheung Station, is expected to be a massive contribution to the line’s ridership (see report in Korean – [link])

The new Mayor of Yongin, who was elected to office 9 months ago, has supported the Everline and demonstrated its versatility by making the Everline a part of his own commute (the Everline has a station in front of Yongin City Hall), and has organized a citizens committee to make the best of the line now that it has been built. He has also used the Everline’s example to push for further rail investment in Yongin City – which may include further extensions of the Everline itself.

Everline trains consist of a single car, which is the same length as our Mark II cars but as wide as our Canada Line vehicles at 3.2m wide. The trains have been termed by some media and riders as “cute”, but derided by critics as being “more like buses”.

Nevertheless, trains run every 4 minutes during weekday peak periods, and no less frequently than every 6 minutes except during early mornings and late nights on weekdays and weekends. This is a higher quality service than many grade-level, driver-operated Light Rail systems. In addition, all stations are ready to accommodate 2-car trains.

Significance to Vancouver

Although the Everline operates an exceptional frequency, the fact that trains operate a single car has created additional dissatisfaction among critics.

You betcha that Everline train looked just a little too familiar. Look, linear motor rails!

The Everline has often caught the attention of transit observers in Metro Vancouver, noting the identical ‘SkyTrain technology’ from Bombardier being used on the new line.

Critics of SkyTrain expansion in our region were the first to jump on the Everline story, framing its issues as reasons that we should avoid expanding our SkyTrain system. I find it particularly ironic that it is the same kind of interference from municipal politicians – which resulted in the Everline’s shortfall as a Yongin City asset – that has been desired by critics referencing that shortfall as a way of stopping SkyTrain expansion.

But it should be clear that none of the problems with the Everline were the result of ‘SkyTrain technology’, or Bombardier. In his interview with Joongang Daily, the Mayor of the City in 2011 cited two reasons why the City was refusing to open the project: issues with ridership (which we now know to have been lack of integration), and issues with construction resulting in “noise and safety concerns”. These apparent construction issues were related to the elevated guideway structure and so a result of the construction contractor, not Bombardier or anything regarding ‘SkyTrain technology’.

Regardless of everything, the Everline has proved to be a successful transit system – and every day it carries more passengers and transforms life for more and more citizens in Yongin, it is turning around its dismal beginning of being a “failure” or a “white elephant” and becoming a true rapid transit icon in Korea.

I believe the Everline Story has two main lessons for all of us here in Metro Vancouver:

  1. “P3” transit projects must be carefully planned and considered. The Yongin Everline is essentially akin to a “what if the Canada Line P3 failed” scenario, with ridership not meeting projections – except the disaster was also kind of pre-empted as a result of fear of failure from the City’s politicians, the resulting delays in opening, and the lack of fare integration. The Canada Line did not fail because it was built on a well-demonstrated transit corridor (the previous 98 B-Line rapid bus was demand proof) and kept a promise to riders by mandating travel time improvements – the designer was actually required to orient its proposal around a set travel time value, and the Canada Line’s reliability in meeting that travel time was subsequently found to be the line’s #1 most-liked aspect in rider surveys. The City of Surrey should particularly be paying attention because it wants to use a P3 model on its proposed grade-level Light Rail system, which is more vulnerable to ridership not meeting projections than a grade-separated SkyTrain extension.
  2. The value of integrating transit fare systems. Major metro areas in North America like the San Francisco Bay Area are facing serious challenges dealing with multiple transit agencies, including major ridership losses due to the lack of integrated fares. We don’t have this problem in Metro Vancouver because of our system of having a single transit operator throughout history. As a result, TransLink is one of North America’s most efficient transit systems.